Anatree Group Logistics AGL logoAnatree Group Logistics

Our fleet

Plant and equipment ready to mobilise

Owned and managed plant, maintained to schedule and operated by trained AGL crews — so the right machine turns up with the right paperwork and the right people.

What we operate

Equipment across lifting, access and transport

From a single HIAB delivery to a fully managed contract lift, we can resource the whole scope from one supplier.

Mobile cranes

City and all-terrain mobile cranes for contract lifts, supplied with appointed person, lift supervisor and slinger/signaller as required.

HIAB & lorry loaders

Crane-mounted vehicles for combined transport and lifting on tight urban sites, ideal for plant, cabins, steelwork and street furniture.

E-LIFT low-emission units

Battery and electric R Unit plant plus EV support vehicles for low-noise, low-emission working in city centres and clean air zones.

MEWPs & access plant

Managed MEWP supply with familiarisation, harness checks and inspection records held against the job.

Transport & last mile

Vans through to artics for last mile deliveries, abnormal and high-value loads, with escort and route planning where needed.

Lifting accessories

Spreader beams, chains, slings, shackles and bespoke lifting frames — all LOLER certified with paperwork issued with the lift plan.

Fleet gallery

Our plant and crews on site

Recent lifts, transport moves and site protection work delivered with AGL plant and operators.

Mobile crane set up on a closed carriageway alongside a hospital building
City crane lift with full road closure, cones and pedestrian management in place.
Night-time two-way traffic light system set up beside a low loader
Night works with two-way light control while plant is delivered by low loader.
HIAB-equipped trailer loaded with a large crated unit secured with ratchet straps
Crated high-value unit strapped and loaded for delivery on our HIAB trailer.
AGL vehicle parked beside a scaffolded tree-mounted telecoms mast
Access scaffold to a tree-mounted mast, supported by an AGL site vehicle.
AGL 4x4 and HIAB trailer carrying galvanised sections across a rural field
Off-road transport of galvanised sections to a rural telecoms compound.
Crew using a HIAB to lift an EV rapid charger from a trailer
EV rapid charger positioned by HIAB with banksman supervising the lift.
Mobile crane and MEWP set up on trackway matting beside a telecoms mast
Crane and MEWP set up on temporary trackway to protect soft ground.
Truck-mounted MEWP working at height on a lattice telecoms tower
Truck-mounted MEWP giving safe access to a lattice tower head frame.
AGL 4x4 and plant trailer parked beneath a tree-disguised telecoms mast
Site vehicle and plant trailer supporting works on a disguised mast.
Operative preparing an installation while crated EV cabinets sit strapped on a trailer
Crated EV cabinets delivered and staged ready for installation on site.
Operative on a podium step rigging an EV charger to a trailer-mounted HIAB
Trailer-mounted HIAB rigging an EV charger with podium steps for safe access.
Aerial view of a mobile crane fully outriggered on ground protection matting
Aerial view of a mobile crane set on full matting to protect a sports ground.
Crated EV chargers strapped to a HIAB trailer ready for transport
Crated rapid chargers strapped and secured for delivery to site.
Night-time lift of a lighting column from a trailer under traffic management
Night-time column lift under live traffic management and coned closure.
HIAB lifting an EV rapid charger clear of the trailer bed
HIAB taking the weight of a rapid charger under banksman supervision.
Lorry-mounted HIAB delivering materials to a scaffolded building
Lorry-mounted HIAB delivering materials to a scaffolded elevation.
AGL tracked carrier moving a wrapped load along a woodland track
Tracked carrier moving a wrapped load through restricted woodland access.
AGL E-LIFT electric van charging at a rapid charging canopy at night
E-LIFT electric van on rapid charge — zero-emission lifting and logistics.
Crew offloading an EV charger from a HIAB trailer onto ground protection mats
Crew offloading a charger onto ground protection mats at an EV hub build.

Maintenance & compliance

How the fleet is kept job-ready

  • Planned preventative maintenance schedules for every asset.
  • LOLER thorough examination and certification held against each item.
  • Daily pre-use checks recorded by operators through AGLive.
  • Defect reporting with plant taken out of service until cleared.
  • Operators trained, assessed and card-carrying for the plant they run.
  • Fleet telematics for location, utilisation and fuel or energy use.

Need a specific machine on site?

Tell us the load, the access and the dates and we'll confirm the right plant and crew for the job.

Contact Us